男人的又粗又长又硬有办法吗,国产精品亚洲一区在线播放,金梅瓶在线观看,麻豆国产精品色欲AV亚洲三区

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.cdcwnj.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

工地防護欄需要如何安裝?

來源:http://www.cdcwnj.com/   發(fā)布時間:2021-10-18

設(shè)備前要測量管線、地上處理(是置換或許夯實的情況)、基坑邊坡、開挖、立柱暫時固定的方位、防護欄桿怎樣設(shè)備、澆注混凝土基礎(chǔ)、基坑圍欄緊固、調(diào)整。測繪:依據(jù)圖紙規(guī)劃要求和實踐地勢、方針進行施工布置圖,設(shè)置立柱中 心線,按規(guī)矩的斜度、線形設(shè)備護欄網(wǎng)。

Before the equipment, first measure the pipeline, ground treatment (in the case of replacement or compaction), foundation pit slope, excavation, the orientation of temporary fixing of columns, protective railing, pouring concrete foundation, fastening and adjustment of foundation pit fence. Surveying and mapping: carry out the construction layout according to the drawing planning requirements and practical terrain and guidelines, set the column centerline, and set the equipment guardrail according to the regular slope and alignment.
原始地基處理是確保護欄和整體穩(wěn)定性的重要條件,為確保立柱的穩(wěn)定性,需求替換和加固地基下的軟層。柱設(shè)備部分,從縱剖面上看,柱軸線呈直線,不應(yīng)呈現(xiàn)不均勻現(xiàn)象;從高處看,柱頂光滑,不應(yīng)呈現(xiàn)不平的情況,特別地勢在外?;鶞?zhǔn)和白線是在調(diào)查和啟航的基礎(chǔ)上建立的。本來的地上被填滿了,斜坡又被夯實了。
The original foundation treatment is an important condition to ensure the guardrail and overall stability. In order to ensure the stability of the column, it is necessary to replace and strengthen the soft layer under the foundation. For column equipment, from the longitudinal section, the column axis is a straight line and should not be uneven; From a high point of view, the top of the column is smooth and should not be uneven, especially the terrain is outside. The benchmark and white line are established on the basis of investigation and sailing. The original ground was filled and the slope was tamped again.
基坑開挖時設(shè)備放樣方位,以確保基坑的巨細(xì)。在基坑立柱設(shè)備進程中,有必要確保柱的穩(wěn)定性和與地基的緊密連接。在立柱設(shè)備進程中,選用小線段對立柱設(shè)備的直線進行測驗,并對部分進行調(diào)整,確保直線段,曲線段滑潤,立柱契合規(guī)劃圖紙要求。網(wǎng)格有必要與柱緊密連接,網(wǎng)面光滑平整,無明顯的翹曲和突起。設(shè)備護欄后,應(yīng)設(shè)備立柱,以確保設(shè)備的正確性和健壯性。
During the excavation of the foundation pit, the equipment setting out direction shall ensure the size of the foundation pit. In the process of foundation pit column equipment, it is necessary to ensure the stability of the column and the close connection with the foundation. In the process of column equipment, select small segments to test the straight line of column equipment, and adjust some parts to ensure that the straight line and curve segments are smooth, and the column meets the requirements of planning drawings. The grid must be closely connected with the column, and the grid surface is smooth and flat without obvious warpage and protrusion. After the equipment guardrail, the equipment column shall be installed to ensure the correctness and robustness of the equipment.
基坑護欄只要精 確健壯的設(shè)備后才能夠有用維護施工安 全,所以設(shè)備前要做的準(zhǔn)備工作也是尤為重要的,決不可粗心,詳細(xì)的設(shè)備進程要看施工現(xiàn)場的實踐情況來做抉擇。
Foundation pit guardrail can effectively maintain construction safety only after accurate and robust equipment, so the preparation before equipment is also particularly important, and must not be careless. The detailed equipment process depends on the practice of the construction site.

娇小12-13╳YⅩ╳毛片高清| 欧美成人动漫在线观看| 欧洲黑人巨大视频在线观看| 久久精品九九| 欧美成人国产精品视频尹人网| 亚洲大码熟女在线观看| 中文字幕巨乱亚洲| 最近日本韩国高清免费观看| 我的变态室友(H)三攻一受| 免费a级毛片视频| 91麻豆福利| 一区二区三区中文字幕| 另类ZZZ00女人ZZZ00| 麻豆成人久久精品二区三区小说| 日日干日日操| 老公的朋友跟我做完就不理我了| 一级毛片在线完整观看| 国产性做爰片免费视频看| 老校长不戴套玩新婚老师| 亚洲人成人无码.WWW石榴| 国产精品亚洲ΑV天堂无码| 欧美特黄aaaaa| 午夜情2在线观看| BL肉YIN荡NP公厕肉便| 女性扒开大腿露出私密部位| 五月天开心中文字幕| 野花日本HD免费高清版7| 亚洲精品AV一区午夜福利| 国产精品人成视频免费播放| 国产未成女YOUNV仙踪林| 白白操在线视频| 国产精品色情国产三级金瓶双艳| 国产国产人免费观看在线视频| 亚洲AV无码精品日韩一区二区| JLZZ日本人年轻护士出水视频| 班长用她的玉足白丝帮我爽| 欧洲成人在线| 欧美DANCEPARTYHD| 国产精品久久久久AV麻豆| 教官趁她睡着吸允她的花蜜| 又粗又大进女下身视频|