男人的又粗又长又硬有办法吗,国产精品亚洲一区在线播放,金梅瓶在线观看,麻豆国产精品色欲AV亚洲三区

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.cdcwnj.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 公司新聞

不同的工地施工圍擋使用要求

來源:http://www.cdcwnj.com/   發(fā)布時(shí)間:2022-09-06

施工圍擋的設(shè)置是要達(dá)到相關(guān)要求和規(guī)范,濟(jì)南圍擋公司為大家整理了一些工地圍擋做法,給大家進(jìn)行參考。
The setting of construction enclosure should meet relevant requirements and specifications. Jinan enclosure company has sorted out some site enclosure practices for your reference.
一、園林綠化工程圍擋的使用要求
1、 Requirements for use of enclosure in Landscaping Engineering
這個(gè)圍擋使用在7天之內(nèi)的園林綠化工程,圍擋兩側(cè)的支架端部設(shè)置是不能少于100公斤的砂帶做壓重。圍擋下腳是可以使用油漆刷成黃黑相間交通的斑馬紋,斑馬紋高是在200毫米,寬是在150毫米,傾斜角度是45度,傾斜角度是指向車輛行駛方向。
This enclosure is used in landscaping projects within 7 days. The ends of the supports on both sides of the enclosure are set with sand belts of not less than 100kg as weights. The lower foot of the fence can be painted with yellow and black zebra stripes for traffic safety. The zebra stripes are 200mm high and 150mm wide. The inclination angle is 45 degrees. The inclination angle points to the driving direction of the vehicle.
二、應(yīng)急搶險(xiǎn)工程圍欄
2、 Emergency rescue engineering fence
應(yīng)急搶險(xiǎn)圍欄框使用DN25的1寸鍍鋅管,圍欄使用一點(diǎn)二毫米鍍鋅板制作。應(yīng)急搶險(xiǎn)圍欄使用插銷鏈接,應(yīng)急搶險(xiǎn)圍欄外表是要粘貼反光膜,應(yīng)急搶險(xiǎn)圍欄上是要注明搶險(xiǎn)工程類型、建設(shè)單位的名稱。
The emergency rescue fence frame is made of DN25 1-inch galvanized pipe, and the fence is made of 1.2mm galvanized plate. The emergency rescue fence shall be linked by a pin. The exterior of the emergency rescue fence shall be pasted with reflective film. The emergency rescue fence shall be marked with the type of rescue project and the name of the construction unit.
濟(jì)南圍擋
三、交叉路口圍擋的使用要求。
3、 Requirements for use of enclosure at intersections.
距離交叉路口20米范圍里的機(jī)動(dòng)車道的施工圍擋,圍擋距離地面零點(diǎn)八米之上的部分是要使用通透性圍擋,是不能形成視覺、聽覺的盲區(qū),圍擋下面是要安裝交通反光條,每六米在立柱上安裝警示燈。
For the construction fence of the motorway within 20 meters from the intersection, the part above 0.8 meters from the ground of the fence should use a permeable fence, which can not form a blind area of vision and hearing. Under the fence, traffic safety reflective strips should be installed, and warning lights should be installed on the columns every six meters.
此外要注意:
Also note:
不要在柵欄附近堆積污垢,建筑材料和其他雜物,保持區(qū)域整潔?施工現(xiàn)場(chǎng)安裝場(chǎng)地的地基應(yīng)有基礎(chǔ)來安裝基礎(chǔ)水泥塊或使用水泥磚。它不能安裝在柔軟的地面上,外殼的風(fēng)穩(wěn)定性提高了,每個(gè)塊的寬度為6米,為了美化建筑圍護(hù)結(jié)構(gòu),應(yīng)使用油漆板作為圍護(hù)板,以確保施工現(xiàn)場(chǎng)圍護(hù)的,質(zhì)量和文明。
Do not accumulate dirt, building materials and other sundries near the fence, and keep the area clean and tidy? The foundation of the installation site at the construction site shall have a foundation to install foundation cement blocks or use cement bricks. It can't be installed on the soft ground, and the wind stability of the shell is improved. The width of each block is 6m. In order to beautify the building envelope, paint plates should be used as the envelope to ensure the quality and civilization of the enclosure on the construction site.
在圍繞施工項(xiàng)目的施工現(xiàn)場(chǎng)施工之前,施工區(qū)域采用臨時(shí)圍欄的形式,作為施工現(xiàn)場(chǎng)的臨時(shí)保護(hù)圍欄,并且施工區(qū)域形成封閉的建筑圈,封閉施工現(xiàn)場(chǎng)圍攏的標(biāo)準(zhǔn)施工現(xiàn)場(chǎng),設(shè)置出入口閘門,建立門衛(wèi)系統(tǒng),嚴(yán)格執(zhí)行外國(guó)人員入境登記制度。
Before construction around the construction site of the construction project, the construction area adopts the form of temporary fence as the temporary protective fence of the construction site, and forms a closed building circle in the construction area, closes the standard construction site surrounded by the construction site, sets up entrance and exit gates, establishes a guard system, and strictly implements the entry registration system for foreign personnel.
施工現(xiàn)場(chǎng)圍欄的安裝應(yīng)根據(jù)項(xiàng)目進(jìn)度進(jìn)行,并且在綠化樹移植之前完成。柵欄的位置應(yīng)整齊,以免妨礙道路交通和行人通行。除了關(guān)閉入口和出口以確保施工現(xiàn)場(chǎng)和邊界隔離之外,在施工期間還應(yīng)分配和維護(hù)交通。更多注意事項(xiàng)就來我們網(wǎng)站http://www.cdcwnj.com咨詢吧!
The installation of the fence on the construction site shall be carried out according to the project schedule and completed before the planting of green trees. The position of the fence shall be neat so as not to hinder road traffic and pedestrian passage. In addition to closing the entrance and exit to ensure the isolation of the construction site and the boundary, traffic shall be allocated and maintained during the construction period. More precautions come to our website http://www.cdcwnj.com Consult!

欧美特黄视频| 女人被强╳到高潮喷水在线观看| JAPANESE丰满人妻HD| 波多野结衣在线观看一区二区| 成人国产欧美精品一区二区| 精品一区二区三区视频| 成年女人午夜毛片免费看| 亚洲狠狠97婷婷综合久久久久| 第一次破了女处小红| 亚洲人成色777777精品音频| 同性双男A片又黄又刺激小说免费| CHINESE老女人老熟妇HD| 我的漂亮女房东完整版在线韩剧| 日本无码视频| 久久99精品久久久久子伦| 日韩欧美群交P片內射中文| 国产人妻777人伦精品HD| 老色69久久九九精品高潮| 老公说我太骚了顶不住什么意思?| 亚洲综合伊人色一区| 国产精品成人在线播放| 国产成人精品永久免费视频| 国产美女视频黄A片免费观看软件| 精品欧美一区二区三区在线| 亚洲一区二区三区四区视频| 色婷婷成人网| 国产又粗又猛又爽又黄A片漫画| 69久久无码一区人妻A片| JULIAANN熟女俱乐部| 成人毛片18女人毛片免费看| 欧美DANCEPARTYHD| 囗交姿势图3D效果展示图| 护士做爰乱高潮全过程| 欧美精品人爱a欧美精品| 国产精品美女久久久久网| 久久精品国产曰本波多野结衣| 日本极品白嫩ASSPICS| 啦啦啦啦日本免费高清在线播放| 成人99精品久久毛片A片小说| 国产又湿又紧又大又爽AV视频| 国产精品自产拍高潮在线观看|